Propipe completed a single line stop operation on a slop gas line at a refinery in Italy, enabling a tank to be taken out of service for subsequent dismantling while the refinery remained operational.
Fitting supplied ahead of the site operation
Before mobilising to site, Propipe supplied the line stop fitting required for the intervention. The client welded the fitting onto the pipeline, preparing the connection for our on-site work.
Isolating the slop gas line without stopping the plant
Our team then carried out the hot tapping and line stopping operation. The single line stop interrupted flow in the slop gas line associated with the tank, allowing the client to proceed with taking the tank out of service and its subsequent dismantling without shutting down the refinery.
The project combined advance fitting supply with an on-site intervention focused on the line that needed to be isolated. The photographs below document the equipment, the line stop installation and completion of the work.
Planning a pipeline intervention for maintenance or decommissioning? Contact Propipe to discuss your project.