Inflatable gas bags are introduced through a Propipe fitting to isolate a section of pipeline. Watch the operation from valve closure and purging to pipe cutting, end closure and reinstatement.
Gas bag isolation in action
LNG pipeline · 2 min 08 sec
THE SYSTEM
One access point. Two isolation bags.
The illustration shows two bags deployed through the fitting and positioned on opposite sides of the access point. Once inflated, they remain in place during the pipe cut and end-cap installation.
After the work is complete, the bags are deflated and withdrawn. An internal closure plug and blind flange close the fitting before the upstream valve is reopened.
Propipe has successfully carried out a Hot Tap and Line Stop gasbag operation at a Liquefied Natural Gas (LNG) plant, enabling critical pipeline intervention without interrupting plant operations.